Skip to content
Skip to content
Serving the Southwest|Electrical · Instrumentation · Controls · Integration
☎1-480-588-8021|inquiries@canfieldeng.com
Canfield Engineering & Integration logo
  • Home
  • Our Services
    • Assessments & Studies
    • Master Planning
    • Electrical Engineering
    • Instrumentation & Controls Engineering
    • Construction & Procurement Support
    • SCADA & PLC Programming
  • Markets
    • Water & Wastewater
    • Mining & Minerals
    • Industrial & Manufacturing
    • Power & Energy
  • Projects
  • Case Studies
  • About
    • Leadership & Team
    • Credentials & Safety
    • Careers
  • Contact Us
  • Home
  • Our Services
    • Assessments & Studies
    • Master Planning
    • Electrical Engineering
    • Instrumentation & Controls Engineering
    • Construction & Procurement Support
    • SCADA & PLC Programming
  • Markets
    • Water & Wastewater
    • Mining & Minerals
    • Industrial & Manufacturing
    • Power & Energy
  • Projects
  • Case Studies
  • About
    • Leadership & Team
    • Credentials & Safety
    • Careers
  • Contact Us
Request a Proposal
Details

Pima County RWRD – TRWRF Headworks Odor Control

Water & WastewaterBy CanfieldCosAdminJuly 22, 2026

Provided design and procurement of PLC control panel CP301 including shop drawings, loop drawings, O&M Manual submittal, as well as delivery of PLC panel to site and factory acceptance test.

Details

Tucson Water – Central Tucson PFAS Project

Water & WastewaterBy CanfieldCosAdminJuly 22, 2026

Provided design, construction support, and programming services. Electrical, instrumentation and controls (EI&C) services included design to support changes and remote access and included P&ID’s to assist with coordination.

Details

City of Cottonwood – Riverfront WRF

Water & WastewaterBy CanfieldCosAdminJuly 22, 2026

Provided complete Electrical and Process instrumentation design for the Riverfront Water Reclamation Facility in Cottonwood, Arizona. The new water reclamation facility was primarily comprised of packaged components including a packaged headworks, Aeromod primary treatment system, Tertiary filters and various support systems.

Details

Fountain Hills Sanitary District – Site-Wide Power Study

Water & WastewaterBy CanfieldCosAdminJuly 22, 2026

CEI conducted a Power System and Arc Flash analysis in accordance with IEEE 1584-2018, utilizing the ANSI method of Short Circuit analysis. CEI prioritized Fountain Hill’s requirements while ensuring accurate data entry and proper evaluation of the Utility Contribution for Max and Min.

Details

El Paso Water – Back-up Power Generators (On-Call)

Power & EnergyBy CanfieldCosAdminJuly 22, 2026

Provided troubleshooting services and on-call support services including Electrical Design, Instrumentation, Programming, and Troubleshooting on an as needed basis.

Details

Pima County RWRD – Energy Master Plan

Power & EnergyBy CanfieldCosAdminJuly 22, 2026

Provided Electrical, Instrumentation & Controls perspective for an assessment, evaluation, and recommendation for upgrade/replacement of existing electrical power and thermal energy structure.

Details

Cave Creek Water Reclamation Plant – EI&C Design

Water & WastewaterBy CanfieldCosAdminJuly 22, 2026

Provided electrical engineering design services and detailed shop drawings for the Cave Creek Water Reclamation Plant.

Details

El Paso Water – John T. Hickson WRF Rehabilitation

Water & WastewaterBy CanfieldCosAdminJuly 22, 2026

Provided Project Management, Inspection and Testing Services, and Electrical Design services for the Design-Build of the John T. Hickson Water Reclamation Facility Rehabilitation Project.

Details

Arizona Copper Mine – Tunnel Discharge Water-Quality Study

MiningBy CanfieldCosAdminJuly 22, 2026

Provided Project Management as well as Electrical Engineering and Instrumentation and Controls services to perform a detailed feasibility study regarding the dilution of water output to Mineral Creek to acceptable levels of Selenium and Copper.

Details

Arizona Mine – Interconnection Pipeline System

MiningBy CanfieldCosAdminJuly 22, 2026

South 32 planned an Interconnection Pipeline System between a Well Field and the Water Treatment Plant 2. Well field was estimated to consist of (10) wells that would pump to a collection tank site including a reservoir and pump station which in turn would pump to a surge tank near WTP2.

←12345→
Canfield Engineering & Integration logo

Canfield Engineering & Integration is a team of highly trained engineers, inspectors, project managers, and safety professionals with decades of combined experience in electrical, instrumentation, and controls engineering. 

Our mission is to help clients navigate complex EI&C challenges with clear guidance and proven engineering.

Contact info

1-480-588-8021

Mon-Fri: 8:00 am to 5:00 pm MST

555 W. Chandler Blvd, Suite 206
Chandler, AZ 85225

Main office location

Site Map
  • Home
  • Our Services
    • Assessments & Studies
    • Master Planning
    • Electrical Engineering
    • Instrumentation & Controls Engineering
    • Construction & Procurement Support
    • SCADA & PLC Programming
  • Markets
    • Water & Wastewater
    • Mining & Minerals
    • Industrial & Manufacturing
    • Power & Energy
  • Projects
  • Case Studies
  • About
    • Leadership & Team
    • Credentials & Safety
    • Careers
  • Contact Us
  • Home
  • Our Services
    • Assessments & Studies
    • Master Planning
    • Electrical Engineering
    • Instrumentation & Controls Engineering
    • Construction & Procurement Support
    • SCADA & PLC Programming
  • Markets
    • Water & Wastewater
    • Mining & Minerals
    • Industrial & Manufacturing
    • Power & Energy
  • Projects
  • Case Studies
  • About
    • Leadership & Team
    • Credentials & Safety
    • Careers
  • Contact Us

© Canfield Engineering & Integration - 2026. All rights reserved.

Privacy Policy
Facebook Instagram Youtube Linkedin
Go to Top